How to use the pre-action protocol deadline calculator
- Choose the protocol. Housing conditions, clinical disputes, personal injury, disease and illness, professional negligence, construction, debt, or no specific protocol.
- Enter the dates. The date of the letter of claim, when it was posted or received, and the date of any acknowledgment: each protocol counts from a different event.
- Read the steps. Each step shows its date, how it was counted and the protocol paragraph, with the earliest date for issue where the protocol sets one.
- Check any flags. Protocol periods do not move off a weekend or bank holiday; a flagged date gives each side the safe reading.
- Copy the dates. Copy the timetable into the letter of claim, a diary note or the file.
The main deadlines at a glance
| Protocol | Acknowledgment | Response | Rule |
|---|---|---|---|
| Housing conditions | No separate acknowledgment | 20 working days of receipt (receipt deemed 2 days after the letter’s date) | Para 6.2 |
| Clinical disputes | 14 days of receipt | Letter of Response within 4 months of the letter of claim | Paras 3.23 and 3.24 |
| Personal injury | 21 calendar days of posting | Up to 3 months from the acknowledgment | Paras 6.2 and 6.3 |
| Disease and illness | 21 days of posting | Reasoned answer within 90 days of the acknowledgment | Paras 7.1 and 7.3 |
| Professional negligence | 21 days of receipt | 3 months from the Letter of Acknowledgment | Paras 7.1 and 8.2 |
| Construction and engineering | 14 calendar days of receipt | Letter of response within 28 days of receipt | Paras 8.1 and 8.5 |
| Debt claims | None | Reply within 30 days of the date at the top of the letter | Para 3.4 |
| No specific protocol | None | 14 days in a straightforward case; no more than 3 months in a very complex one | PD Pre-Action Conduct para 6(b) |
How protocol periods are counted
- No court has decided how protocol periods are counted; these are the general rules for time limits.
- Each protocol has its own start: receipt, the date of posting, the date of the letter, or the date of the acknowledgment.
- The day the period runs from is not counted, so “within 14 days of receipt” on 22 October ends on 5 November (Matthew v Sedman [2021] UKSC 19 [28]).
- Months end on the corresponding date, or the last day of a shorter month (Dodds v Walker [1981] 1 WLR 1027); 90 days is not three months.
- Working days are Monday to Friday, excluding bank holidays in England and Wales.
- A period that ends on a weekend or bank holiday does not move: CPR 2.8(5) applies only to acts at the court office.
Housing conditions claims
Receipt of the letter of claim is deemed two days after its date (assuming it was sent that day), and the landlord should normally reply within 20 working days of receipt (para 6.2). The inspection should follow within 20 working days of the landlord’s response, and the single joint expert’s report within 10 working days of the inspection (para 7.4). The Civil Procedure Rule Committee agreed a rewritten Housing Conditions Claims (England) protocol, reflecting Awaab’s Law, on 5 June 2026 and recommended it to the Master of the Rolls, with implementation intended for “autumn 2026”; it had not been published on 20 October 2026, and this page will follow it when it is. The letter of claim can also start a social landlord’s Awaab’s Law timescales: see the Awaab’s Law timescales checker.
Limitation
Protocol periods never stop the limitation clock. If a claim has to be issued before the protocol is complete, issue it and ask the court to stay the claim while the parties comply (PD Pre-Action Conduct para 17). A paper claim is brought when the court office receives the claim form (PD 7A para 6.1), but in the Damages Claims Portal a claim is only brought when it is issued, after the fee is paid (PD 51ZB para 2.2(4)): do not leave it to the last day.
Related tools
- After issue: the deemed service calculator and the CPR deadline calculator
- Housing claims: the Awaab’s Law timescales checker
- Interest on the damages: the interest on damages calculator
Sources
- Practice Direction – Pre-Action Conduct and Protocols
- Pre-action protocols: Housing Conditions Claims (England), Resolution of Clinical Disputes, Personal Injury Claims, Disease and Illness Claims, Professional Negligence, Construction and Engineering Disputes and Debt Claims
- CPR Part 2 (rules 2.8 and 2.10)
- Matthew v Sedman [2021] UKSC 19
- Lancastle v Curo Group (Albion) Ltd [2025] EWCC 48
- Practice Direction 51ZB (the Damages Claims Portal) and Practice Direction 7A